Namami Gange; Curse for Patna. incessant rain made Patnaites life hell
- jaiomjisumitra yadav
- Jul 28
- 4 min read

Namami Gange, an ambitious project, launched with fanfare, has lost its direction in Bihar. More that 7500 Crores of Rupess hass already been spent in Bihar on this scheme but it is far from completion. The corruption, lack of proper monitoring, apathy of concerned top officials have made this scheme a fiasco. The roads have been dug without proper plannning and coordination and piples were laid for creating network for sewer have failed to yeild desired results. In stead, this destroyed many good conditioned roads resulting into great difficulties for commuters.
Last night, heavy rainfall exposed all tall claims made by the govt about improvment in the civic amenities in Patna - Here is a report-----
the massive mismanagement and corruption surrounding the Namami Gange project in Patna, Bihar. The project, intended to clean and treat sewage before releasing it into the Ganges River, has instead worsened the pollution situation. With a budget of approximately ₹75,000 crore allocated for Bihar, including cities like Patna, Bhagalpur, Munger, and Ara, the project’s execution has been grossly inefficient and corrupt. Despite large sums of money spent—over ₹45,000 crore reportedly already disbursed—key infrastructure like sewage networks and treatment plants remain non-functional or incomplete.
The Public Works Department’s body, BUDCO, has been highlighted as the epicenter of this corruption and mismanagement. They are accused of creating parallel drainage systems that are poorly coordinated, damaging old drainage infrastructure, and conducting substandard road repairs that collapse during rains. The poor urban planning and failed drainage systems have led to flooding in key areas of Patna, including VIP zones, government offices, and residential areas. The video suggests that the entire Namami Gange project in Bihar could be one of the biggest scams in the state’s history, with close ties to ruling political parties and officials.
Om Prakash Yadav also critiques the government’s urban development strategy, pointing out the failure to decentralize urban growth, instead crowding Patna with critical infrastructure like the PMCH hospital, which exacerbates congestion and infrastructure strain. He warns that unless a thorough investigation is conducted, many engineers and officials involved could face legal consequences. Ultimately, the project meant to clean the Ganges has instead polluted it further, and the citizens of Patna must decide the fate of this flawed and corrupt initiative.
Highlights
🌧️ Patna’s recent rain exposed the massive failure and corruption in the Namami Gange project.
💰 Around ₹75,000 crore allocated for Bihar’s sewage management, with over ₹45,000 crore already spent.
🏗️ Parallel drainage systems built without coordination damaged old infrastructure, worsening flooding.
🚧 Poor construction and incomplete sewage treatment plants have rendered the project non-functional.
🏢 Flooding affected VIP areas, government offices, residential zones, and key roads in Patna.
🏛️ BUDCO and its engineers are accused of corruption and mismanagement, controlling key projects and contracts.
⚠️ The project is considered one of Bihar’s biggest scams, with possible links to ruling political parties.
Key Insights
💸 Massive Financial Mismanagement: The Namami Gange project in Bihar has seen the disbursement of tens of thousands of crores with little to no functional output. This highlights a severe lapse in financial oversight and accountability, exposing taxpayers’ money to misuse on an unprecedented scale. The budget intended for comprehensive sewage treatment and infrastructure has largely been wasted, indicating systemic corruption.
🏗️ Infrastructure Failure Due to Poor Planning: The decision to implement parallel drainage systems without proper coordination resulted in the destruction of existing drainage lines. This lack of integration between traditional and new systems caused widespread flooding and infrastructural damage during rains, reflecting poor urban engineering and project management. This failure has compromised the very objective of the Namami Gange mission.
👷 Role of BUDCO as a Corruption Hub: The Bihar Urban Development Corporation (BUDCO), responsible for executing much of the project, is accused of monopolizing contracts and appointments, creating a power center controlled by a few engineers and officials. This concentration of control has led to unchecked corruption and inefficiency, turning a vital public welfare project into a lucrative avenue for graft.
🌆 Urbanization and Poor Development Strategy: The government’s failure to decentralize Patna’s urban growth has exacerbated infrastructure stress. Instead of relocating key institutions like PMCH to less crowded areas, they were concentrated in already congested parts of the city. This shortsighted urban planning has increased population density and infrastructure burden, contributing to drainage and sewage challenges.
⚠️ Political Nexus and Lack of Accountability: The video strongly suggests a nexus between the ruling political party and corrupt officials managing the project. The scale of the scam and the involvement of government engineers indicate systemic issues that require thorough investigation. Without accountability, such projects will continue to fail, harming public interest.
🌊 Environmental and Public Health Impact: Instead of cleaning the Ganges, the project has effectively worsened pollution by dumping untreated or poorly treated sewage directly into the river. This environmental degradation threatens public health and contradicts the core objectives of the Namami Gange initiative, pointing to a failure in environmental governance.
🔍 Need for Transparent and Rigorous Investigation: The speaker calls for a comprehensive probe into the project’s mismanagement and corruption. Such an inquiry could expose the extent of irregularities and hold responsible officials accountable. This is crucial not only for justice but also to restore faith in government projects aimed at urban and environmental development.
The video presents a detailed exposé of how a major government initiative intended for public good can be derailed by corruption, poor planning, and lack of accountability, ultimately harming the very communities it aimed to serve.




Comments